Pipe thickness: 2.5mm-5mm
Connection end: Flange/ U plate/ nuts
Surface treatment: Hot dip galvanizing 65~100 μm
Package:
1)pole anchor packed in cartons and fixed by steel pallets;
2)Bulk on pallets with four corner protector and wooden board on the top, two PP/steel strips and stretch film wrapped on pallets.
For the part less than 10kg each, there will be about 150pcs/ pallet, 2100pcs/20’container. Quantity tolerance: ±10%